Productivity Estimators: During the course of developing a mud logging company we formulated a productivity estimator from the mud logging system. This is NOT applicable to any mud logging system. In fact it was ONLY applicable to the system we developed. The principles and science however are applicable in understanding the evaluation process. In this system we were able to regularly match Schlumberger calculated Water Saturations from open hole logs.

FlowStone Gas Chart
Click the above image to view a printable PDF file of the interpretation chart.

Productivity Estimates

Productivity Estimate from Open Hole Logs
Rw Porosity Rt Sw
Lime %
Sand
Productivity Estimate from Flowstone Mudlogs
Percent of Flow Sampled Funnel Viscosity of Drilling Fluid GOR of Reservoir Total Gas from Mudlog Swml
Mud System
Water System %